SEC-E441X HORIBA STEC Economy Series 200 SLM Gas Flow Control MFC
Manufacturer: HORIBA
Product No.: SEC-E441X
Condition: In stock
Product Type: Gas Flow Control
Product Origin: USA
Payment: T/T, Western Union
Weight: 500g
Shipping port: Xiamen
Warranty: 12 months
Estimate delivery times: 12-26 days (International), 3-6 days (United States).
Return within 30 days of purchase. Duties & taxes are non-refundable.
Guaranteed Safe Checkout
SEC-E441X | High-Flow Gas Control with Economy Solenoid Technology
The HORIBA STEC SEC-E441X is a high-flow mass flow controller from the SEC-E Economy Solenoid Valve Series. It regulates non-corrosive gas flow in industrial gas delivery systems.
Its maximum full-scale capacity reaches 200 SLM (N2 equivalent). The solenoid valve design supports economical gas flow control for applications with high-volume supply requirements.
The controller uses an analog electrical interface for setpoint and flow output signals. Its normally closed valve provides a defined valve state when power is removed.
With SUS316 stainless steel wetted components and fluorine-based sealing materials, the SEC-E441X supports integration into compatible bulk gas supply and pump purge systems.
01 | Product Identity and Core Specifications
| Manufacturer | HORIBA STEC |
| Model | SEC-E441X |
| Product Series | SEC-E Economy Solenoid Valve Series |
| Product Type | Analog Mass Flow Controller (MFC) |
| Maximum Full-Scale Flow | 200 SLM |
| Flow Reference Gas | N2 equivalent |
| Supported Gas Category | Non-corrosive gases |
| Control Range | 5% to 100% FS |
| Accuracy | ±1% FS |
| Repeatability | ±0.5% FS |
| Linearity | ±0.5% FS |
| Response Time | ≤2 seconds (T98, typical) |
| Valve Technology | Solenoid valve |
| Power-Off Valve State | Normally closed |
| Heating Configuration | Standard unheated version |
02 | Gas Path Construction and Pressure Limits
The gas-contact assembly combines stainless steel and polymer materials. These components support the specified non-corrosive gas applications.
| Wetted Stainless Steel | SUS316 stainless steel |
| Additional Wetted Materials | Fluorine rubber, PTFE, magnetic stainless steel |
| Seal Materials | Fluorine rubber (Viton) / PTFE |
| Operating Differential Pressure | 200–350 kPa(d) |
| Maximum Inlet Pressure | 350 kPa(G) |
| Pressure Resistance | 1 MPa(G) |
| Helium Leak Integrity | ≤1 × 10⁻⁹ Pa·m³/s |
Material selection note: Verify gas compatibility with the wetted materials and seals. Do not use this model for corrosive gases without explicit manufacturer approval.
03 | Analog Control and Electrical Requirements
| Setpoint Signal | 0.25–5 VDC |
| Flow Output Signal | 0–5 VDC |
| Electrical Connector | D-Sub connector |
| Positive Supply | +15 VDC ±5%, 50 mA |
| Negative Supply | -15 VDC ±5%, 200 mA |
| Power Consumption | 3.9 VA |
- The analog setpoint provides an external flow command.
- The voltage output represents the controller's flow signal.
- The D-Sub interface connects the controller to compatible control equipment.
- The bipolar power supply requires suitable positive and negative voltage rails.
04 | Operating Conditions and Performance Envelope
| Operating Temperature | 5°C to 45°C |
| Accuracy Guarantee Temperature | 15°C to 35°C |
| Standard Configuration | Unheated |
| Applicable Gas Category | Non-corrosive gases |
The controller operates within a 5°C to 45°C temperature range. Its specified accuracy applies within the narrower 15°C to 35°C range.
05 | Why Engineers Select the SEC-E441X
- 200 SLM Flow Capacity: Handles high-volume gas delivery requirements within its specified configuration.
- Economy Solenoid Design: Provides a cost-conscious approach to high-flow gas regulation.
- Normally Closed Valve: Closes the solenoid valve when electrical power is removed.
- Analog Signal Interface: Supports voltage-based setpoint and flow monitoring.
- Stainless Steel Gas Path: Uses SUS316 stainless steel and compatible sealing materials.
- Defined Pressure Envelope: Provides specified differential and inlet pressure limits for system design.
- Helium Leak Specification: Supports evaluation of gas-path sealing performance.
06 | High-Flow Application Scenarios
| Bulk Gas Supply | Regulates high-volume non-corrosive gas delivery in compatible supply systems. |
| Pump Purge Systems | Controls purge gas flow for suitable industrial and semiconductor equipment. |
| Gas Distribution Panels | Provides analog flow regulation within compatible gas delivery assemblies. |
| Industrial Gas Equipment | Supports high-flow gas supply where the specified materials and pressure limits apply. |
| Process Equipment | Provides voltage-controlled gas flow regulation for compatible machinery. |
07 | Installation and System Integration
- Confirm Gas Compatibility: Verify the process gas against the approved material and calibration configuration.
- Check Flow Capacity: Confirm that 200 SLM suits the required operating flow.
- Verify Pressure Conditions: Maintain the specified differential and inlet pressure limits.
- Inspect Gas Connections: Confirm the connection specification before assembling the piping.
- Connect Analog Signals: Match the setpoint and output wiring with the equipment interface.
- Verify Power Rails: Check positive and negative supply voltages before energizing the unit.
- Configure Control Logic: Match the PLC or controller scaling with the specified voltage ranges.
- Check Valve Operation: Verify normally closed behavior during power removal.
- Perform Leak Testing: Follow approved procedures before introducing process gas.
08 | Commissioning and Preventive Maintenance
- Zero-Flow Check: Verify the output under the manufacturer's specified zero-flow conditions.
- Signal Calibration: Check the analog setpoint and feedback scaling.
- Flow Verification: Compare the output against a suitable calibrated flow reference.
- Pressure Monitoring: Check actual inlet and outlet pressure conditions.
- Valve Inspection: Investigate delayed response or unstable flow behavior.
- Leak Inspection: Examine gas connections after installation and maintenance.
- Power Inspection: Monitor both supply rails for voltage stability.
- Environmental Control: Maintain the recommended accuracy temperature range where precision is critical.
09 | Compatibility and Replacement Considerations
The SEC-E441X uses an analog interface and a normally closed solenoid valve. Replacement selection requires electrical, mechanical, and process compatibility checks.
- Confirm the SEC-E Economy Solenoid Valve Series designation.
- Verify the 200 SLM N2-equivalent full-scale configuration.
- Match the process gas with the specified wetted materials.
- Check the analog voltage ranges and D-Sub connector arrangement.
- Confirm the bipolar power supply requirements.
- Verify pressure conditions and gas connection dimensions.
- Check the normally closed valve requirement.
- Confirm the accuracy requirements at the actual operating temperature.
Important: The supplied specifications identify a 3/8-inch Swagelok connection as a key feature. Confirm the exact fitting configuration before ordering or replacing the unit.
10 | Compliance and Technical Standards
- SEMI Standards: Compliance with SEMI standards is indicated in the supplied product information.
- Gas Compatibility: Specified for non-corrosive gas applications.
- Leak Integrity: Helium leak specification of ≤1 × 10⁻⁹ Pa·m³/s.
Specific SEMI standard numbers and supporting certificates require manufacturer documentation. Verify project-specific compliance requirements before installation.
11 | Ordering and Supply Information
- Brand: HORIBA STEC
- Model: SEC-E441X
- Series: SEC-E Economy Solenoid Valve
- Product Type: High-Flow Mass Flow Controller
- Full-Scale Capacity: 200 SLM, N2 equivalent
- Condition: New & Original in Factory Packing
- Warranty: Factory Warranty: 12 Months
- Shipping: FedEx, UPS, and DHL available
Package Contents: One SEC-E441X mass flow controller. Confirm connection accessories and other configuration-specific items before ordering.
12 | Global PLC Spare HUB – Application Insight
The HORIBA STEC SEC-E441X targets high-flow applications that require economical analog gas regulation. Its 200 SLM capacity makes pressure management and upstream supply design important selection factors.
Engineers should pay particular attention to the 5% FS lower control limit. At a 200 SLM full-scale setting, this represents a nominal lower control boundary of 10 SLM.
The accuracy specification uses full scale as its reference. At 200 SLM, ±1% FS corresponds to ±2 SLM under the specified accuracy conditions. This distinction matters when evaluating low-flow process requirements.
The normally closed solenoid valve also affects system behavior during power interruption. Engineers should evaluate the resulting gas isolation behavior within the complete equipment safety design.
13 | Frequently Asked Questions
Q1: Is the SEC-E441X suitable for applications requiring very low flow rates?
Its specified control range starts at 5% FS. For a 200 SLM configuration, this equals 10 SLM. Applications below this boundary require a different full-scale configuration or another suitable controller.
Q2: How does the normally closed valve affect equipment shutdown design?
The valve closes when electrical power is removed. Engineers should consider this behavior when designing shutdown sequences and restart procedures. Verify whether additional isolation devices or safety measures are necessary.
Q3: Can the controller connect directly to a PLC analog output and input?
Its 0.25–5 VDC setpoint and 0–5 VDC output support compatible voltage interfaces. Check PLC signal ranges, common references, grounding, and D-Sub pin assignments. Do not assume direct wiring without checking the electrical documentation.
Q4: Why can actual flow accuracy differ from the nominal ±1% FS specification?
Operating temperature, gas calibration, pressure differential, and installation conditions can influence system performance. The stated accuracy guarantee applies from 15°C to 35°C. Use a suitable reference instrument during commissioning to verify actual performance.
Q5: When should buyers choose a 200 SLM controller instead of a smaller model?
Choose the full-scale range according to normal operating flow and required control margin. Avoid excessive oversizing because full-scale accuracy affects absolute flow deviation. For example, a 200 SLM model may not suit a process that normally operates below 10 SLM.
Tags
Q: Are these parts 100% original and new?
A: Yes. Every component is guaranteed to be 100% original, brand-new, and factory-sealed. We also provide a 12-month comprehensive warranty for your peace of mind.
Q: How fast is the shipping to my country?
A: For in-stock items, we offer same-day dispatch. International express shipping (DHL/FedEx/UPS) typically delivers within 3–5 business days worldwide.
Q: Can I get a formal quotation with shipping costs?
A: Absolutely. Our sales team is ready to provide a detailed Proforma Invoice (PI) including the most competitive shipping rates for your location.
Q: Do you offer discounts for bulk orders?
A: We provide volume-based pricing for large projects or multiple-item orders. Please contact us to get our Best Price Guarantee.
12-Month Comprehensive Warranty
Every part supplied by Global PLC Spare Hub is covered by a 12-month warranty from the date of invoice.
- Coverage: Functional defects and hardware failures under normal operating conditions.
- Commitment: We provide immediate repair, replacement, or a full refund for any verified defective components to minimize your operational downtime.
Returns & Exchange Policy
We offer a 30-day return policy to ensure you receive the exact part your system requires.
- Eligibility: Returns are accepted for uninstalled items in their original, factory-sealed packaging.
- RMA Process: Please contact our support team to obtain a Return Merchandise Authorization (RMA) number before shipping.
- Fast Processing: Refunds or exchanges are processed within 3–5 business days after the returned item passes our technical inspection.
Need Technical Assistance?Not sure if this part is compatible with your system? [Consult our Engineers] before purchasing to ensure 100% compatibility.


