IS420CCGAH2A GE Mark VIe Communication Gateway RTU Module
Manufacturer: GE
Product No.: IS420CCGAH2A
Condition: In stock
Product Type: Communication Gateway Module
Product Origin: USA
Payment: T/T, Western Union
Weight: 500g
Shipping port: Xiamen
Warranty: 12 months
Estimate delivery times: 12-26 days (International), 3-6 days (United States).
Return within 30 days of purchase. Duties & taxes are non-refundable.
Guaranteed Safe Checkout
Product Overview
- The IS420CCGAH2A (functional part variant IS420CCGAH2AC) serves as a high-density Communication Gateway Module.
- Engineered specifically for the Mark VIe Series control platform by GE Energy, it carries the functional acronym CCGA.
- This specialized network interface bridges critical control layer data with high-level plant monitoring infrastructure.
- The module features functional revision 1 A hardware architecture designed for continuous industrial runtime.
Global PLC Spare HUB's Insight
- Our field evaluation confirms that the IS420CCGAH2A functions as a highly ruggedized Remote Terminal Unit (RTU) processing link.
- Unlike simple unmanaged protocol converters, this Communication Gateway Module directly arbitrates deterministic control frames.
- It routes critical human-machine interface (HMI) inputs, engineering keypad directives, and supervisory control data acquisition (SCADA) variables.
- The dual-bus internal processor isolates sub-network jitter, ensuring that heavy Modbus traffic cannot flood the core turbine controller backplane.
Technical Specifications
- Manufacturer: GE Energy
- Part Number: IS420CCGAH2A / IS420CCGAH2AC
- Control Series: Mark VIe Series
- Functional Acronym: CCGA
- Revision Index: 1 Revision / Functional Revision 1 A
- Network Interfaces: 4 x independent high-speed Ethernet ports
- Peripheral Routing: Multipurpose onboard USB ports for local diagnostics and flashing
- Legacy Connectivity: High-isolation integrated Serial ports supporting point-to-point links
- Protocol Architecture: Native Modbus RTU master/slave bridging over Ethernet layers
- Data Mapping Capacity: Real-time dynamic variable translation directly to the main HMI screen
- Command Processing: Low-latency relaying of mission-critical operator panel and SCADA commands
Target Device & System Compatibility
- This IS420CCGAH2A node integrates natively into GE Mark VIe control cabinets.
- It establishes seamless hardware handshakes with industrial Modbus devices, flow meters, and smart instrumentation.
- The module links directly with corporate plant historian networks, SCADA control servers, and local operator interface terminals.
Typical Application Scenarios
- Substation Integration: Acts as an intelligent data aggregator bridging auxiliary electrical substation monitors to the central turbine controller.
- HMI Visualization Linkage: Manages high-throughput polling rates to drive graphic updates on main power plant operator workstations.
- Distributed SCADA Telemetry: Translates remote dispatch command sequences into secure native Ethernet packets for real-time turbine adjustment.
- Field Instrumentation Consolidation: Pools diverse serial-based sensor streams into a single managed backbone array.
Advanced Diagnostic Capabilities
- The hardware utilizes internal status reflection to report network port loading statistics directly back to the controller framework.
- Physical link checking mechanisms flag instantaneous packet drop counts across all four Ethernet ports.
- Loopback validation sequences across the serial data pins quickly isolate physical wiring breaks from software configuration issues.
- Onboard health registries monitor active connection states to issue preventative warnings before full timeout faults impact the system.
Shipping & Logistics Terms
- Courier Routing: Worldwide express delivery handled exclusively via FedEx, UPS, or DHL.
- Dispatch Lead Time: Consignments securely packed and shipped within 24 to 48 hours from transaction settlement.
Package List & Warranty
- 1 x GE Energy IS420CCGAH2A Communication Gateway Module.
- 1 x Commercial grade anti-static protective enclosure box.
- Coverage Terms: Fully backed by a robust 12-month warranty plan protecting mechanical and electrical performance parameters.
Procurement & Selection Guide
- Confirm that your existing plant topology requires the 4-port CCGA acronym variant rather than a basic network switch.
- Match the functional revision 1 A standard with your running software configuration version to ensure total database map synchronization.
- Review network bandwidth consumption guidelines to guarantee that the four onboard ports cover your entire field device architecture layout.
Frequently Asked Questions (FAQ)
- How does this gateway handle concurrent polling requests from both serial ports and network links?
The internal operating architecture utilizes a deterministic priority queue to process incoming Modbus data strings without dropping high-priority SCADA commands. - Can the auxiliary USB connections on this hardware be used for long-term database storage expansion?
No, field engineering guidelines dictate that those interfaces are strictly reserved for short-term software initialization tools and local analytical configurations. - What step is recommended if an active network port unexpectedly enters a continuous link-down state?
Check the physical grounding shielding of your external RJ45 cables first, as transient electromagnetic interference frequently triggers automatic port isolation logic. - Is a specialized software tool needed to map the internal registers of the Modbus sub-networks?
The configuration is handled directly within the native control system software toolbox, which maps the communication variables seamlessly into your running system program. - Does this unit support autonomous operation if it drops connections with the main controller?
The module will preserve the last known safe states of the serial sub-loops and broadcast a hardware network timeout flag to the HMI screen until data links recover.
Tags
Q: Are these parts 100% original and new?
A: Yes. Every component is guaranteed to be 100% original, brand-new, and factory-sealed. We also provide a 12-month comprehensive warranty for your peace of mind.
Q: How fast is the shipping to my country?
A: For in-stock items, we offer same-day dispatch. International express shipping (DHL/FedEx/UPS) typically delivers within 3–5 business days worldwide.
Q: Can I get a formal quotation with shipping costs?
A: Absolutely. Our sales team is ready to provide a detailed Proforma Invoice (PI) including the most competitive shipping rates for your location.
Q: Do you offer discounts for bulk orders?
A: We provide volume-based pricing for large projects or multiple-item orders. Please contact us to get our Best Price Guarantee.
12-Month Comprehensive Warranty
Every part supplied by Global PLC Spare Hub is covered by a 12-month warranty from the date of invoice.
- Coverage: Functional defects and hardware failures under normal operating conditions.
- Commitment: We provide immediate repair, replacement, or a full refund for any verified defective components to minimize your operational downtime.
Returns & Exchange Policy
We offer a 30-day return policy to ensure you receive the exact part your system requires.
- Eligibility: Returns are accepted for uninstalled items in their original, factory-sealed packaging.
- RMA Process: Please contact our support team to obtain a Return Merchandise Authorization (RMA) number before shipping.
- Fast Processing: Refunds or exchanges are processed within 3–5 business days after the returned item passes our technical inspection.
Need Technical Assistance?Not sure if this part is compatible with your system? [Consult our Engineers] before purchasing to ensure 100% compatibility.



