  • Manufacturer: GE

  • Product No.: IS200VAICH1DAA

  • Condition: In stock

  • Product Type: Analog I/O Board

  • Product Origin: USA

  • Payment: T/T, Western Union

  • Weight: 500g

  • Shipping port: Xiamen

  • Warranty: 12 months

Selected quantity: 1
Request a quote

Estimate delivery times: 12-26 days (International), 3-6 days (United States).

Return within 30 days of purchase. Duties & taxes are non-refundable.

Guaranteed Safe Checkout

Visa
PayPal
Mastercard
American Express

Technical Engineering Brief

The General Electric IS200VAICH1DAA functions as a high-density analog processing node within the Mark VI Speedtronic control ecosystem.

Engineers deploy this Versa Module Eurocard form-factor board to condition, digitize, and command critical field telemetry natively.

The assembly provides dual-configuration versatility, operating seamlessly in standalone Simplex modes or voter-synchronized Triple Modular Redundant architectures.

By translating 20 differential analog inputs and driving 4 precision control loops, the module maintains deterministic execution continuously.

Core Architecture & Technical Specifications

  • Brand: General Electric (GE)
  • Model: IS200VAICH1DAA
  • Series: Mark VI Speedtronic
  • Component Type: Analog Input/Output Board (VAIC)
  • Input Signal Capacity: 20 Channels (Distributed across two terminal blocks, 10 loops each)
  • Output Signal Capacity: 4 Channels (Distributed across two terminal blocks, 2 loops each)
  • Native Current Span: 4-20 mA standard operating range (High-current option up to 0-200 mA)
  • Power Consumption Threshold: Under 31 mW nominal operating draw
  • Circuit Fabrication: High-density surface mount technology
  • Form Factor: Standard VME rack-mountable single-slot printed circuit board
  • High-Impedance Driving Capacity: Delivers up to 18 V DC drive voltage at terminal screw boundaries
  • Maximum Loop Load Resistance: Overcomes loop impedance limits up to 800 ohms
  • Field Cabling Tolerance: Sustains rated 800-ohm current drives across 1000 ft of #18 AWG field wire
  • Onboard Specialized Firmware: Integrated gas turbine compressor stall detection logic
  • Field Transducer Power: 24 V DC supply routed with diode auctioning choices from the backplane
  • Physical Interface Array: Features JT1, JS1, and JR1 fanned output ports for multi-rack linking
  • Hardware Revision Architecture: Double functional engineering update with single artwork revision layer

Host Equipment Interoperability

The GE IS200VAICH1DAA populates standard VME control racks and establishes high-speed communication loops with:

  • GE Mark VI Control System VME Control Racks (R, S, and T positions)
  • TBAI standard termination modules
  • TBAIH1C specialized analog terminal assemblies
  • STAI termination blocks for localized signal marshalling
  • VCMI VME Bus Master Communication Interface controllers

Target Field Implementations

  • Advanced gas turbine automated drive assemblies and multi-fuel delivery systems.
  • Utility-scale steam turbine high-pressure hydraulic actuator management.
  • High-capacity wind turbine variable pitch and yaw control mechanisms.
  • Multi-axis heavy industrial compressor anti-surge protection schemes.

Network Diagnostics & Protection Engineering

  • Front-Panel Diagnostic Arrays: High-visibility status LEDs provide real-time hardware health and system verification.
  • TMR Failover Isolation: Proprietary voting circuits isolate a faulted board within 60 ms without loop disruption.
  • Mechanical Retaining System: Features J3 and J4 latching connectors on the lower VME chassis to prevent vibration disconnects.
  • High-Potential Isolation: Decouples field-side analog loop disturbances from the core VME control backplane.

Global PLC Spare HUB's Insight

The General Electric IS200VAICH1DAA represents a major leap in turbine control flexibility compared to legacy architectures.

By adding native wind turbine algorithms alongside traditional steam and gas firmware, it serves as an excellent upgrade piece.

The 18 V DC drive margin at the terminal screws makes this module highly reliable in large processing plants.

It resolves signaling issues common to long wire runs without requiring external loop boosters.

For critical TMR paths, its hardware voting ensures that single-point I/O failures do not cause unexpected shutdowns.

Logistical Logistics & Warranty Terms

  • Standard Packaging: Original equipment specification anti-static protective shipping layout.
  • Express Courier Distribution: International priority logistics managed by FedEx, UPS, and DHL.
  • Processing Lead Time: Guaranteed dispatch within 24 to 48 hours from our logistics center.
  • Extended Coverage: Provided with a comprehensive 12-month commercial warranty covering component function.

Advanced Engineering FAQ

How does this board handle input data routing to the master controller within a standard VME rack setup?

The board converts the incoming 4-20 mA analog currents into digital values smoothly.

It then transfers them across the VME backplane to the VCMI master card for processor routing.

What is the physical connection procedure to prevent signal interruption on the lower VME chassis area?

You must interface your field cables through the J3 and J4 latching connectors located on the lower rack.

Ensure the integrated mechanical latches snap securely into place to prevent vibration drift.

Can a single board run a partial TMR setup, or does the system require three separate units?

True TMR operation requires three separate boards installed in the R, S, and T racks.

A single module can only run in a Simplex configuration, which lacks hardware fault voting.

How do the 4 analog output channels behave if one board fails while running a TMR voted loop?

The proprietary voting circuit automatically drops the failed board from the output loop immediately.

This allows the remaining two units to balance the load and maintain correct current smoothly.

What step should engineering teams take first if the top diagnostic LEDs depart from their normal patterns?

Cross-reference the active LED fault pattern with the GEH-6421 Volume II system manual immediately.

This helps pinpoint whether the issue stems from an internal board fault or external field loop opens.

Procurement Guidance

  • Verify Firmware Selection: Review your system guide to match the compressor stall detection firmware with your current turbine configuration.
  • Check Interface Cabling: Ensure your cable layout matches the JR1, JS1, and JT1 fanned configuration if upgrading from older layouts.
  • Match Termination Boards: Confirm that your marshaling panels use compatible TBAI, TBAIH1C, or STAI hardware options before starting field deployment.

Tags

Q: Are these parts 100% original and new?

A: Yes. Every component is guaranteed to be 100% original, brand-new, and factory-sealed. We also provide a 12-month comprehensive warranty for your peace of mind.

Q: How fast is the shipping to my country?

A: For in-stock items, we offer same-day dispatch. International express shipping (DHL/FedEx/UPS) typically delivers within 3–5 business days worldwide.

Q: Can I get a formal quotation with shipping costs?

A: Absolutely. Our sales team is ready to provide a detailed Proforma Invoice (PI) including the most competitive shipping rates for your location.

Q: Do you offer discounts for bulk orders?

A: We provide volume-based pricing for large projects or multiple-item orders. Please contact us to get our Best Price Guarantee.




12-Month Comprehensive Warranty

Every part supplied by Global PLC Spare Hub is covered by a 12-month warranty from the date of invoice.

  • Coverage: Functional defects and hardware failures under normal operating conditions.
  • Commitment: We provide immediate repair, replacement, or a full refund for any verified defective components to minimize your operational downtime.

Returns & Exchange Policy

We offer a 30-day return policy to ensure you receive the exact part your system requires.

  • Eligibility: Returns are accepted for uninstalled items in their original, factory-sealed packaging.
  • RMA Process: Please contact our support team to obtain a Return Merchandise Authorization (RMA) number before shipping.
  • Fast Processing: Refunds or exchanges are processed within 3–5 business days after the returned item passes our technical inspection.

Need Technical Assistance?Not sure if this part is compatible with your system? [Consult our Engineers] before purchasing to ensure 100% compatibility.