Home IS200TTURH1CED General Electric Mark VI Speedtronic Termination Board
IS200TTURH1CED General Electric Mark VI Speedtronic Termination Board
IS200TTURH1CED General Electric Mark VI Speedtronic Termination Board
IS200TTURH1CED General Electric Mark VI Speedtronic Termination Board
IS200TTURH1CED General Electric Mark VI Speedtronic Termination Board
IS200TTURH1CED General Electric Mark VI Speedtronic Termination Board
IS200TTURH1CED General Electric Mark VI Speedtronic Termination Board

IS200TTURH1CED General Electric Mark VI Speedtronic Termination Board

  • Manufacturer: GE

  • Product No.: IS200TTURH1CED

  • Condition: In stock

  • Product Type: Termination Board

  • Product Origin: USA

  • Payment: T/T, Western Union

  • Weight: 500g

  • Shipping port: Xiamen

  • Warranty: 12 months

Selected quantity: 1
Request a quote

Estimate delivery times: 12-26 days (International), 3-6 days (United States).

Return within 30 days of purchase. Duties & taxes are non-refundable.

Guaranteed Safe Checkout

Visa
PayPal
Mastercard
American Express

Engineering Architecture Overview

The IS200TTURH1CED (part variant IS200TTURH1C) is a high-performance turbine control termination card engineered by General Electric for the advanced Mark VI and Mark VIe Speedtronic digital control ecosystems. Built primarily for generator synchronization management, this rectangular printed circuit board coordinates complex signal routing alongside companion PTUR and VTUR processor cards.

Advanced Technical Specifications

Manufacturer General Electric (GE Speedtronic)
Series & Platform Mark VI / Mark VIe
Primary Model Number IS200TTURH1CED (IS200TTURH1C)
Product Classification Turbine Generator Synchronization Termination Board
Redundancy Control Selectable via onboard configuration jumpers (Simplex or TMR voting)
Signal Interfacing Male/Female D-shell connectors, plug connectors, and numbered screw terminal blocks
Active Circuitry Surface-mounted control relays, variable resistors, and dual central isolation transformers
Physical Construction Rectangular PCB layout with precision cutouts and rugged backplane fastening points

Hardware Deployment & Setup Protocols

  • Secure the board firmly into the designated turbine control cabinet slot, ensuring correct alignment with backplane connectors.
  • Configure the dual physical jumper switches to match your plant architecture—select simplex mode for standalone drops or TMR mode for triple-modular redundant voting networks.
  • Terminate incoming control lines into the numbered screw-mounted primary terminal blocks, adhering strictly to loop diagrams.
  • Connect inter-board communication lines using shielded D-shell male and female cables linked directly to the PTUR and VTUR modules.

Diagnostic Capabilities & Troubleshooting

  • Monitor surface-mounted relay states during synchronization sequences to ensure proper contact closure timing.
  • Inspect the dual central transformers and variable resistors if generator frequency matching signals exhibit attenuation or phase drift.
  • Verify continuity across D-shell interface ports when control system fault logs report communication timeouts with companion processor cards.

Target Equipment & Industrial Applications

  • Heavy industrial gas turbine management and steam turbine governing systems.
  • Utility-scale power generation plants utilizing GE Speedtronic Mark VIe distributed control networks.
  • Synchronous generator electrical grid tie-in and phase-matching control skids.

Global PLC Spare HUB's Insight & Field Experience

During major turbine overhauls, field engineers often trace synchronization mismatch alarms back to improperly configured redundancy jumpers on the termination card. Ensuring that the dual hardware jumpers are correctly set for TMR or simplex prior to powering up the rack prevents immediate controller trip conditions. Furthermore, securing the D-shell connector thumbscrews tightly eliminates intermittent ground feedback caused by high-vibration turbine environments.

Warranty, Logistics & Supply Chain Terms

  • Operational Warranty: Fully covered by our comprehensive 12-month replacement warranty.
  • Fulfillment & Delivery: Rapid 24-48 hour global dispatch routing via FedEx, UPS, and DHL.
  • Hardware Status: Factory-inspected and ready for immediate plant integration.
  • Package Contents: 1 x IS200TTURH1CED termination assembly.

Frequently Asked Questions

Q: How do I switch the board between simplex and triple-modular redundant operation?
A: Adjust the two physical onboard jumper switches according to the hardware manual schematic to change circuit routing for TMR voting logic.

Q: Which companion processor boards must work alongside this termination card?
A: It operates in conjunction with PTUR and VTUR modules to manage precise generator synchronization across Speedtronic platforms.

Q: What are the best practices for selecting replacement boards for legacy Mark VI upgrades?
A: Always verify the exact revision suffix and match your existing system's redundancy architecture (simplex vs. TMR) before ordering to ensure seamless plug-and-play compatibility.

Q: What causes synchronization feedback errors linked to the IS200TTURH1CED board?
A: Errors typically stem from loose D-shell communication cables, uncalibrated variable resistors, or oxidized screw terminal connections.

Q: Are special tools required to service the terminal blocks on this card?
A: No, standard precision insulated screwdrivers are sufficient to secure wires into the numbered screw-mounted terminal blocks safely.

Tags

Q: Are these parts 100% original and new?

A: Yes. Every component is guaranteed to be 100% original, brand-new, and factory-sealed. We also provide a 12-month comprehensive warranty for your peace of mind.

Q: How fast is the shipping to my country?

A: For in-stock items, we offer same-day dispatch. International express shipping (DHL/FedEx/UPS) typically delivers within 3–5 business days worldwide.

Q: Can I get a formal quotation with shipping costs?

A: Absolutely. Our sales team is ready to provide a detailed Proforma Invoice (PI) including the most competitive shipping rates for your location.

Q: Do you offer discounts for bulk orders?

A: We provide volume-based pricing for large projects or multiple-item orders. Please contact us to get our Best Price Guarantee.




12-Month Comprehensive Warranty

Every part supplied by Global PLC Spare Hub is covered by a 12-month warranty from the date of invoice.

  • Coverage: Functional defects and hardware failures under normal operating conditions.
  • Commitment: We provide immediate repair, replacement, or a full refund for any verified defective components to minimize your operational downtime.

Returns & Exchange Policy

We offer a 30-day return policy to ensure you receive the exact part your system requires.

  • Eligibility: Returns are accepted for uninstalled items in their original, factory-sealed packaging.
  • RMA Process: Please contact our support team to obtain a Return Merchandise Authorization (RMA) number before shipping.
  • Fast Processing: Refunds or exchanges are processed within 3–5 business days after the returned item passes our technical inspection.

Need Technical Assistance?Not sure if this part is compatible with your system? [Consult our Engineers] before purchasing to ensure 100% compatibility.