SEC-Z512 SEC-Z500X HORIBA STEC Multi-Gas Mass Flow Controller
Manufacturer: HORIBA
Product No.: SEC-Z512
Condition: In stock
Product Type: Flow Controller
Product Origin: USA
Payment: T/T, Western Union
Weight: 500g
Shipping port: Xiamen
Warranty: 12 months
Estimate delivery times: 12-26 days (International), 3-6 days (United States).
Return within 30 days of purchase. Duties & taxes are non-refundable.
Guaranteed Safe Checkout
HORIBA STEC SEC-Z512 | Multi-Gas Digital Mass Flow Controller
The HORIBA STEC SEC-Z512 is a precision digital mass flow controller from the SEC-Z500X Series. It regulates process gas delivery in semiconductor manufacturing and advanced industrial applications.
Its compact design combines thermal mass flow measurement with piezoelectric valve control. The controller supports multiple gas types and selectable full-scale flow ranges. Engineers can reconfigure compatible gas and range settings on-site.
The SEC-Z512 provides a response time of ≤1 second (T98). Its analog interface supports voltage-based setpoint and measurement signals. The RS-485 F-Net interface provides an additional digital communication option.
With polished SUS316L wetted surfaces and 1/4-inch VCR connections, this model suits precision gas delivery assemblies. Typical installations include semiconductor gas panels, CVD equipment, etching systems, and deposition processes.
01 | Engineering Identity & Performance Profile
| Manufacturer | HORIBA STEC |
| Model | SEC-Z512 |
| Product Family | SEC-Z500X Series |
| Product Category | Digital Mass Flow Controller (MFC) |
| Control Technology | Thermal Mass Flow Measurement with Piezoelectric Actuation |
| Flow Configuration | Multi-gas / Multi-range |
| Communication | Analog Voltage / RS-485 F-Net |
| Heating Configuration | Standard Unheated Version |
| Valve Options | Normally Open / Normally Closed |
| Installation Connection | 1/4-inch VCR Male |
02 | Flow Control Envelope
The SEC-Z512 supports nitrogen-equivalent full-scale ranges from 10 SCCM to 5.5 SLM. The selected MR/MG configuration determines the available capacity.
| Performance Item | Specification |
|---|---|
| Full-Scale Flow Range | 10 SCCM–5.5 SLM |
| Control Range | 2–100% FS |
| Accuracy Above 25% FS | ±1.0% S.P. |
| Accuracy At or Below 25% FS | ±0.25% FS |
| Repeatability | ±0.2% FS |
| Linearity | ±0.5% FS |
| Response Time | ≤1 second (T98) |
Engineering Interpretation: The accuracy specification changes with the operating point. Above 25% FS, accuracy references the setpoint. At lower flow rates, the specification references full scale.
For low-flow applications, engineers should evaluate absolute full-scale accuracy rather than relying only on percentage-of-setpoint accuracy.
03 | Gas Compatibility & Reconfiguration
The SEC-Z512 supports multiple process gases through compatible gas-specific configurations.
- Inert Gases: Nitrogen (N2), Argon (Ar), Helium (He), and Hydrogen (H2).
- Oxidizing Gases: Oxygen (O2) and Nitrous-free process configurations as specified by the selected gas setup.
- Etching Gases: Sulfur Hexafluoride (SF6), Carbon Tetrafluoride (CF4), and Nitrogen Trifluoride (NF3).
- Deposition Gases: Silane (SiH4), Phosphine (PH3), Tungsten Hexafluoride (WF6), and Hydrogen Bromide (HBr).
- Other Process Gases: Carbon Monoxide (CO), Ethylene (C2H4), and Hexafluoroethane (C2F6).
Multi-gas capability does not mean unrestricted gas interchangeability. Each gas requires a compatible calibration and configuration. Verify wetted-material compatibility and seal selection before changing process gases.
04 | Electrical Architecture & Signal Integration
| Setpoint Signal | 0.1–5 VDC |
| Measurement Output | 0–5 VDC |
| Digital Communication | RS-485 F-Net Protocol |
| Communication Speed | 38,400 bps |
| Connector Interfaces | D-Sub 9-pin and RJ-45 |
| Positive Supply | +15 VDC ±5%, 150 mA |
| Negative Supply | -15 VDC ±5%, 150 mA |
The analog interface supports conventional voltage-based control architectures. The RS-485 interface provides digital communication through the F-Net protocol.
Before connecting the controller, verify the connector pinout and signal reference. Do not assume standard Modbus RTU compatibility from the RS-485 electrical interface alone.
05 | Mechanical Construction & Process Boundaries
| Body Dimensions | 126 × 64 × 29 mm |
| Dimension Order | Height × Width × Thickness |
| Standard Connection | 1/4-inch VCR Male |
| Wetted Material | SUS316L Stainless Steel |
| Internal Surface | Electropolished / Polished Standard |
| Seal Options | Metal or Elastomer |
| Actuator | Piezoelectric |
| Operating Temperature | 5–50°C |
| Recommended Temperature | 15–45°C |
| Maximum Operating Pressure | 450 kPa(g) |
| Operating Differential Pressure | 50–300 kPa(d) |
| Pressure Resistance | 1000 kPa(g) |
| Helium Leak Integrity | ≤5 × 10⁻¹² Pa·m³/s |
The SUS316L flow path supports controlled gas handling in semiconductor equipment. The specified helium leak integrity supports demanding gas-line integrity requirements.
The metal or elastomer seal selection must match the process gas and operating conditions. Confirm the exact seal configuration before procurement.
06 | Installation & Commissioning Considerations
Mechanical Installation
- Check the mounting space against the 126 × 64 × 29 mm envelope.
- Confirm 1/4-inch VCR male connections at the installation interface.
- Inspect sealing surfaces for scratches and particle contamination.
- Use compatible fittings and follow the specified connection torque.
- Maintain the required upstream and downstream pressure conditions.
Electrical Commissioning
- Provide stable positive and negative 15 VDC supplies.
- Verify supply polarity and voltage before energizing the unit.
- Match the PLC analog output to the 0.1–5 VDC setpoint range.
- Scale the 0–5 VDC measurement signal correctly in the control system.
- Configure RS-485 communication at 38,400 bps when using F-Net.
- Check connector pin assignments before applying power.
Initial Process Verification
- Confirm the selected gas and full-scale range.
- Check the pressure differential under actual operating conditions.
- Verify the zero-flow output before introducing process gas.
- Apply several setpoints and observe the measured response.
- Compare readings against an appropriate calibrated reference instrument.
07 | Diagnostic Notes for Process Engineers
Unstable Flow at Low Setpoints
Check whether the operating point approaches the lower control limit. Inspect supply pressure fluctuations and downstream pressure changes. Confirm the selected gas calibration before adjusting the control system.
Analog Reading Does Not Match the Reference Instrument
Verify the PLC input scaling and signal reference. Check the 0–5 VDC measurement range. Confirm that the reference instrument uses the same gas and compatible flow conditions.
RS-485 Communication Failure
Inspect the wiring, connector pinout, and network configuration. Confirm the 38,400 bps communication setting. Also verify F-Net protocol compatibility at the host controller.
Slow Flow Stabilization
Inspect the differential pressure and gas supply stability first. Then check for restrictions, incorrect gas settings, or unsuitable process-line conditions. Avoid changing controller tuning without manufacturer guidance.
08 | Standards & Compliance
- RoHS: RoHS compliance is specified for the product.
- SEMI: SEMI E56-0309 is listed in the supplied product information.
Verify the applicable manufacturer's declaration and exact product configuration when project specifications require formal compliance documentation.
09 | Package & Procurement Verification
Confirm the following items against the purchase order before shipment:
- HORIBA STEC SEC-Z512 mass flow controller.
- Confirmed full-scale flow range and gas calibration.
- Selected normally open or normally closed valve configuration.
- Specified metal or elastomer seal arrangement.
- Required electrical interface and connector configuration.
- Product identification and applicable technical documentation.
Power cables, communication cables, fittings, and additional accessories require separate confirmation. Do not assume their inclusion unless the quotation specifies them.
10 | Professional FAQ: Selection, Integration & Field Experience
Q1: How should engineers evaluate the SEC-Z512 for a multi-gas gas panel?
Start with the actual gas list and required flow ranges. Check whether each gas has an approved calibration configuration. Then review seal compatibility, pressure requirements, and valve behavior. A shared controller platform does not eliminate gas-specific configuration requirements.
Q2: What causes a flow offset after replacing an existing MFC?
Common causes include different gas calibration, incorrect analog scaling, and pressure differences. Engineers should compare the replacement unit's full-scale range and signal characteristics with the original installation. Recheck zero-flow output before returning the gas panel to production.
Q3: How can engineers reduce flow instability during recipe transitions?
Review the pressure regulator response and gas-line volume. Check whether the upstream supply can maintain stable differential pressure during rapid demand changes. Use the controller's response specification as a reference, not as a guarantee of total system settling time.
Q4: What should buyers verify when selecting metal or elastomer seals?
Evaluate chemical compatibility, operating pressure, temperature, and contamination requirements. Reactive gases require particular attention to seal compatibility. Confirm the approved seal material for every intended process gas before finalizing the order.
Q5: When should an engineer choose analog control instead of F-Net communication?
Analog control suits systems with established voltage-based I/O and straightforward setpoint integration. F-Net suits installations that require digital communication and centralized parameter exchange. Check the host controller's protocol support and maintenance requirements before selecting the interface.
HORIBA STEC SEC-Z512 | Technical Sourcing Support
Global PLC Spare HUB assists industrial users with model identification and instrumentation sourcing. We support technical inquiries involving HORIBA mass flow controllers and semiconductor process equipment.
- Model Verification: Check flow range, gas type, valve action, and electrical configuration.
- Technical Assistance: Review connection, pressure, and integration requirements.
- Warranty: 12-month warranty according to confirmed sales terms.
- Shipping: FedEx, UPS, and DHL shipping options.
- Dispatch: Typical arrangement within 24–48 hours, subject to stock and order confirmation.
Request a Quote for SEC-Z512
Send us your required gas type, full-scale flow rate, seal preference, and interface requirements. Our team can help verify the HORIBA STEC SEC-Z512 configuration and prepare a quotation for your application.
Tags
Q: Are these parts 100% original and new?
A: Yes. Every component is guaranteed to be 100% original, brand-new, and factory-sealed. We also provide a 12-month comprehensive warranty for your peace of mind.
Q: How fast is the shipping to my country?
A: For in-stock items, we offer same-day dispatch. International express shipping (DHL/FedEx/UPS) typically delivers within 3–5 business days worldwide.
Q: Can I get a formal quotation with shipping costs?
A: Absolutely. Our sales team is ready to provide a detailed Proforma Invoice (PI) including the most competitive shipping rates for your location.
Q: Do you offer discounts for bulk orders?
A: We provide volume-based pricing for large projects or multiple-item orders. Please contact us to get our Best Price Guarantee.
12-Month Comprehensive Warranty
Every part supplied by Global PLC Spare Hub is covered by a 12-month warranty from the date of invoice.
- Coverage: Functional defects and hardware failures under normal operating conditions.
- Commitment: We provide immediate repair, replacement, or a full refund for any verified defective components to minimize your operational downtime.
Returns & Exchange Policy
We offer a 30-day return policy to ensure you receive the exact part your system requires.
- Eligibility: Returns are accepted for uninstalled items in their original, factory-sealed packaging.
- RMA Process: Please contact our support team to obtain a Return Merchandise Authorization (RMA) number before shipping.
- Fast Processing: Refunds or exchanges are processed within 3–5 business days after the returned item passes our technical inspection.
Need Technical Assistance?Not sure if this part is compatible with your system? [Consult our Engineers] before purchasing to ensure 100% compatibility.