Home Honeywell FS-PDC-IOSET FSC I/O Chassis Power Distribution Cable

Honeywell FS-PDC-IOSET FSC I/O Chassis Power Distribution Cable

  • Manufacturer: Honeywell

  • Product No.: FS-PDC-IOSET

  • Condition: In stock

  • Product Type: Power Distribution Cable

  • Product Origin: USA

  • Payment: T/T, Western Union

  • Weight: 200g

  • Shipping port: Xiamen

  • Warranty: 12 months

Selected quantity: 1
Request a quote

Estimate delivery times: 12-26 days (International), 3-6 days (United States).

Return within 30 days of purchase. Duties & taxes are non-refundable.

Guaranteed Safe Checkout

Visa
PayPal
Mastercard
American Express

Product Overview

The Honeywell FS-PDC-IOSET is an I/O chassis power distribution cable set for Honeywell Safety Manager and FSC systems.

It transfers DC power from the FS-MB-0001 mains power rail to the I/O chassis. Supported supply voltages include 24 VDC, 48 VDC, and 110 VDC.

The cable set connects to the rear power interfaces of the I/O chassis. These interfaces include IP1, EP1, EP2, and EP3.

Each cable provides a defined connection path between the power busbar and chassis. Its low-profile, right-angle housing supports practical installation in rack-mounted control cabinets.

Key Engineering Benefits:

  • Power Distribution: Transfers DC supply power from the mains busbar to the I/O chassis.
  • Multiple Voltage Options: Supports 24 VDC, 48 VDC, and 110 VDC applications.
  • Defined Connection Points: Uses dedicated IP1, EP1, EP2, and EP3 chassis interfaces.
  • Four Cable Lengths: Provides different lengths for individual chassis power connections.
  • Industrial Connectors: Uses a squeeze-to-release busbar connector and an FM5W5 female chassis connector.

Technical Specifications

Parameter Specification
Manufacturer Honeywell
Model FS-PDC-IOSET
Product Series Safety Manager / FSC
Product Type I/O Chassis Power Distribution Cable Set
Primary Function DC power distribution from mains power rails to I/O chassis
Compatible Power Rail FS-MB-0001
Supported Supply Voltages 24 VDC / 48 VDC / 110 VDC
Cable Type CC 600 World
Conductor Configuration 4 × 2.5 mm²
Busbar-Side Connector 2-pole squeeze-to-release type
Busbar Connector Model D-TAB-200-STR
Chassis-Side Connector FM5W5 S, female
Connector Housing Low-profile, 90-degree configuration
Chassis Connection Points IP1 / EP1 / EP2 / EP3
Approvals UL, CSA; FM pending according to supplied specifications

Cable Length and Connector Identification

The FS-PDC-IOSET includes four cable variants. Each variant serves a designated I/O chassis power connection.

Cable Variant Chassis Connection Length
FS-PDC-IOEP1a EP1 33 cm
FS-PDC-IOEP2a EP2 41 cm
FS-PDC-IOEP3a EP3 49 cm
FS-PDC-IOIP1a IP1 57 cm

Connection identification:

  • IP1: Dedicated chassis power connection using the 57 cm cable.
  • EP1: Dedicated chassis power connection using the 33 cm cable.
  • EP2: Dedicated chassis power connection using the 41 cm cable.
  • EP3: Dedicated chassis power connection using the 49 cm cable.

Verify the chassis wiring diagram before assigning individual cables. Do not determine connection positions from cable length alone.

Installation Guidelines

  1. Isolate the Power Supply: Disconnect the DC supply before installation. Follow the plant's electrical safety procedures.
  2. Identify the Power Rail: Locate the compatible FS-MB-0001 mains power rail.
  3. Check Cable Identification: Match each cable variant with its designated chassis connection.
  4. Connect the Busbar: Insert the two-pole D-TAB-200-STR connector into the corresponding power rail connection.
  5. Connect the Chassis: Attach the FM5W5 female connector to the designated rear interface.
  6. Inspect Cable Routing: Maintain suitable clearance around adjacent wiring and chassis components.
  7. Verify Polarity: Check the wiring diagram and supply polarity before energizing the system.

Important: The system supports different DC voltage levels. When using 48 VDC or 110 VDC, apply clear voltage identification labels or sleeves. This practice reduces wiring errors during maintenance.

Commissioning and Maintenance

Correct cable identification helps engineers reduce commissioning errors. Use the following checks during installation and maintenance.

  • Voltage Verification: Confirm the actual supply voltage before connecting the cable set.
  • Connector Inspection: Check connector seating, locking condition, and contact integrity.
  • Cable Inspection: Look for insulation damage, sharp bends, and mechanical stress.
  • Connection Verification: Confirm IP1, EP1, EP2, and EP3 assignments against the chassis diagram.
  • Voltage Identification: Maintain consistent labels for 24 VDC, 48 VDC, and 110 VDC circuits.
  • Periodic Inspection: Check cable routing and connector condition during scheduled cabinet maintenance.

The cable set does not perform voltage conversion or signal conditioning. Engineers must verify the supply voltage and distribution architecture independently.

Compatibility and Application Notes

The Honeywell FS-PDC-IOSET is designed for power distribution within compatible Honeywell FSC and Safety Manager I/O chassis installations.

Component Compatibility or Function
FS-MB-0001 Mains power rail supplying DC power to the cable set.
IOCHAS-0001 Example of a compatible I/O chassis application.
IP1 / EP1 / EP2 / EP3 Rear chassis power connection interfaces.
24 VDC / 48 VDC / 110 VDC Supported DC power distribution voltages.

Selection Notice: Confirm the chassis version, power rail configuration, connector arrangement, and voltage requirements before ordering.

Do not assume that every FSC or Safety Manager chassis uses the same cable arrangement. Consult the applicable Honeywell hardware documentation.

Certifications and Compliance

  • UL: Listed in the supplied approval specifications.
  • CSA: Listed in the supplied approval specifications.
  • FM: Pending according to the supplied product information.

Confirm the applicable approval status against the exact product revision and project requirements before installation.

Package Contents

  • 1 × Honeywell FS-PDC-IOSET I/O chassis power distribution cable set, subject to the ordered configuration.
  • Associated cable variants: FS-PDC-IOEP1a, FS-PDC-IOEP2a, FS-PDC-IOEP3a, and FS-PDC-IOIP1a, as specified for the supplied set.
  • Integrated busbar-side and chassis-side connectors.

Confirm the exact cable quantity and included variants with the supplier before shipment.

Frequently Asked Questions (FAQ)

Q1: What is the primary function of the FS-PDC-IOSET?

The FS-PDC-IOSET distributes DC power from the FS-MB-0001 mains power rail to a compatible I/O chassis. It provides the required physical power connections.

Q2: Can this cable set support both 24 VDC and 110 VDC systems?

Yes. The specified application includes 24 VDC, 48 VDC, and 110 VDC supplies. Always verify the cable identification and system wiring before connection.

Q3: Why does the cable set contain different cable lengths?

Each cable length corresponds to a designated chassis connection. The different lengths support the physical routing requirements of IP1, EP1, EP2, and EP3.

Q4: What should engineers check when an I/O chassis receives no power?

First, verify the upstream DC supply and mains power rail. Next, inspect connector seating, cable continuity, polarity, and the assigned chassis interface. Check the power distribution diagram before replacing components.

Q5: Can engineers replace one cable independently?

Replacement depends on the required connection and cable variant. Match the original part number, length, connector configuration, and voltage application. Do not substitute cables based on physical appearance alone.

Q6: How should users select the correct FS-PDC-IOSET configuration?

Check the chassis model, FS-MB-0001 compatibility, required DC voltage, and rear connector positions. Confirm whether the application requires all four cable variants or a specific replacement cable.

Q7: What installation mistake should maintenance teams avoid?

Do not interchange cables solely because their connectors appear similar. Incorrect interface assignment or voltage identification can cause power distribution problems. Label each cable before installation, especially in mixed-voltage cabinets.

Ordering Information

Looking for the Honeywell FS-PDC-IOSET power distribution cable set?

Contact our team for pricing, stock availability, delivery options, and compatibility verification.

Please provide your chassis model, power rail model, and required voltage. Our team can help verify the correct cable configuration for your application.

Tags

Q: Are these parts 100% original and new?

A: Yes. Every component is guaranteed to be 100% original, brand-new, and factory-sealed. We also provide a 12-month comprehensive warranty for your peace of mind.

Q: How fast is the shipping to my country?

A: For in-stock items, we offer same-day dispatch. International express shipping (DHL/FedEx/UPS) typically delivers within 3–5 business days worldwide.

Q: Can I get a formal quotation with shipping costs?

A: Absolutely. Our sales team is ready to provide a detailed Proforma Invoice (PI) including the most competitive shipping rates for your location.

Q: Do you offer discounts for bulk orders?

A: We provide volume-based pricing for large projects or multiple-item orders. Please contact us to get our Best Price Guarantee.




12-Month Comprehensive Warranty

Every part supplied by Global PLC Spare Hub is covered by a 12-month warranty from the date of invoice.

  • Coverage: Functional defects and hardware failures under normal operating conditions.
  • Commitment: We provide immediate repair, replacement, or a full refund for any verified defective components to minimize your operational downtime.

Returns & Exchange Policy

We offer a 30-day return policy to ensure you receive the exact part your system requires.

  • Eligibility: Returns are accepted for uninstalled items in their original, factory-sealed packaging.
  • RMA Process: Please contact our support team to obtain a Return Merchandise Authorization (RMA) number before shipping.
  • Fast Processing: Refunds or exchanges are processed within 3–5 business days after the returned item passes our technical inspection.

Need Technical Assistance?Not sure if this part is compatible with your system? [Consult our Engineers] before purchasing to ensure 100% compatibility.