Home HD2-FBPS-1.500 Pepperl+Fuchs FieldConnex Power Supply

HD2-FBPS-1.500 Pepperl+Fuchs FieldConnex Power Supply

  • Manufacturer: Pepperl+Fuchs

  • Product No.: HD2-FBPS-1.500

  • Condition: In stock

  • Product Type: Power Supply Module

  • Product Origin: DE

  • Payment: T/T, Western Union

  • Weight: 200g

  • Shipping port: Xiamen

  • Warranty: 12 months

Selected quantity: 1
Request a quote

Estimate delivery times: 12-26 days (International), 3-6 days (United States).

Return within 30 days of purchase. Duties & taxes are non-refundable.

Guaranteed Safe Checkout

Visa
PayPal
Mastercard
American Express

HD2-FBPS-1.500 | Pepperl+Fuchs High-Power Fieldbus Power Supply Module

The HD2-FBPS-1.500 from Pepperl+Fuchs is a motherboard-based fieldbus power supply module. It provides a high-power trunk for FOUNDATION Fieldbus H1 and PROFIBUS PA segments.

The module delivers a nominal output of 28–30 V DC with a rated current of up to 500 mA. Its galvanic isolation separates the fieldbus segment from the supply circuit through functional insulation rated at 250 V AC.

Designed for high device counts and long cable runs, the HD2-FBPS-1.500 supports redundant configurations and hot swapping. Maintenance personnel can exchange the module without tools while the system operates, subject to the approved redundant system design.

01 | Fieldbus Power Architecture

The module supplies operating power to a fieldbus segment through a motherboard-based installation. Its high-power trunk design supports applications that require more field devices or longer cable lengths.

Design Element Specification Engineering Significance
Module architecture Motherboard-based Uses a compatible motherboard for electrical and mechanical connection.
Fieldbus output 28–30 V DC Provides power to the connected fieldbus segment.
Rated output current Up to 500 mA Defines the available segment power capacity.
Short-circuit current 550 mA Specified short-circuit current characteristic.
Galvanic isolation Functional insulation, 250 V AC Separates the fieldbus segment from the supply circuit.
Supported fieldbus systems FOUNDATION Fieldbus H1 and PROFIBUS PA Supports the two specified process fieldbus technologies.

Application focus: Use this module where segment power capacity, cable distance, and field-device quantity influence the fieldbus power design. Calculate the complete segment load before selecting the power supply arrangement.

02 | Electrical Operating Window

The input supply accepts a wide DC voltage range. The module converts this supply into the specified fieldbus output voltage and current.

Electrical Parameter Value
Rated supply voltage (Ur) 19.2–35 V DC
Rated supply current (Ir) 910–490 mA
Typical power dissipation 1.8 W
Output voltage (UN) 28–30 V DC
Output current (IN) 500–10 mA
Short-circuit current 550 mA
Maximum output voltage for hazardous-area application (Uo) 32 V

Design note: The specified 500 mA represents the maximum rated output current, not a guaranteed current for every installation condition. Check the actual segment load, cable resistance, device consumption, and voltage drop at the farthest field device.

03 | Redundancy and Online Maintenance

The HD2-FBPS-1.500 supports hot swapping in a redundant configuration. This feature helps maintenance teams replace a module without interrupting normal system operation when the complete installation supports the required redundancy.

  • Redundant operation: Supports integration into a redundant power supply arrangement.
  • Hot-swap capability: Allows module exchange during operation in a suitable redundant configuration.
  • Tool-free replacement: The module can be exchanged without tools.
  • Maintenance planning: Confirm the active and standby module states before replacement.

Hot swapping does not mean that every single-module installation can tolerate removal without interruption. Verify the motherboard arrangement, redundancy configuration, and system maintenance procedure before removing a module.

04 | LED Diagnostics and Fault Interpretation

Two front-panel indicators provide basic information about output power and fault conditions.

Indicator State Meaning Recommended Check
PWR Green Output voltage is above 28 V. Confirm the fieldbus segment receives the expected voltage.
ERR Red flashing Output short circuit or undervoltage. Inspect segment wiring, connected devices, and supply conditions.

Field troubleshooting sequence:

  1. Check the PWR LED and determine whether the output exceeds the 28 V indication threshold.
  2. Check whether ERR flashes, indicating a short-circuit or undervoltage condition.
  3. Inspect fieldbus trunk and spur wiring for shorts, damaged insulation, or incorrect terminations.
  4. Review the total current demand of connected field devices.
  5. Measure voltage at the segment distribution point and at representative remote devices.
  6. Check the upstream DC supply against the 19.2–35 V DC input range.

A flashing ERR LED does not identify the exact fault location. Use segment measurements and wiring checks to distinguish a short circuit from an overloaded or undervoltage condition.

05 | Mechanical Design and Installation Data

The module uses a compact polycarbonate housing and a motherboard-specific connection arrangement. Confirm the motherboard type before installation.

Mechanical Parameter Specification
Mounting method Motherboard mounting
Connection type Motherboard-specific
Core cross section Motherboard-specific
Housing material Polycarbonate
Width 18 mm
Height 106 mm
Depth 128 mm
Weight Approximately 150 g
Degree of protection IP20

Installation considerations:

  • Use the motherboard specified for the module and system architecture.
  • Check the module position and mechanical alignment before insertion.
  • Keep the installation area clean and free from conductive debris.
  • Observe the IP20 limitation when selecting the cabinet or enclosure.
  • Maintain sufficient cabinet space for wiring access and heat dissipation.

06 | Environmental Performance

The specified environmental limits support installation in demanding industrial control cabinets.

Environmental Parameter Specification
Operating temperature -40 to +70 °C
Storage temperature -40 to +85 °C
Relative humidity Less than 95%, non-condensing
Shock resistance 15 g, 11 ms
Vibration resistance 1 g, 10–150 Hz
Pollution degree Maximum 2, according to IEC 60664
Corrosion resistance ISA-S71.04-1985, severity level G3

For corrosive industrial environments, consider the cabinet atmosphere and the actual installation location. The G3 classification provides an environmental reference, but it does not eliminate the need for suitable enclosure and corrosion-control measures.

07 | Standards and Hazardous-Area Approvals

The supplied technical information lists the following standards and approvals.

Category Reference
EMC directive 2014/30/EU
EMC standard EN 61326-1:2013
EMC recommendation NE 21:2011
Fieldbus standard IEC 61158-2
Degree of protection IEC 60529
Shock testing EN 60068-2-27
Vibration testing EN 60068-2-6

Hazardous-area certification details:

Approval System Certificate Marking
ATEX TÜV 04 ATEX 2500 X II 3 G Ex nA IIC T4 Gc
FM FM 19 US 0015 X and FM 19 CA 0011 X AEx/Ex ec IIC T4
IECEx IECEx TUN 13.0038X Ex nA IIC T4 Gc

Installation in classified areas: The module is specified for Zone 2 and Class I, Division 2 applications. Confirm the certificate conditions, installation instructions, temperature class, and permitted system configuration before use.

The hazardous-area output parameter Uo is specified as 32 V. Do not use this value alone to determine field-device compatibility. Check the complete certified entity parameters and system documentation.

08 | Field Engineering: Segment Design and Selection

When selecting a fieldbus power supply, engineers should evaluate the complete segment rather than relying only on the maximum output current.

  • Device count: Add the current consumption of every connected field device.
  • Cable length: Calculate voltage drop across the trunk and spur cables.
  • Trunk loading: Confirm the current demand remains within the module's rated output capacity.
  • Redundancy: Check whether the selected motherboard and power architecture support redundant operation.
  • Hazardous-area design: Verify the required approval and entity parameters for the installed segment.
  • Environmental conditions: Confirm temperature, humidity, corrosion, and cabinet protection requirements.

Practical selection advice: A segment may remain below the 500 mA current limit yet experience low voltage at remote devices. Cable resistance, connector losses, and spur distribution can affect the available voltage. Include these factors in the fieldbus power budget.

09 | Frequently Asked Questions

Q1: How do I determine whether a fieldbus segment needs a high-power trunk supply?

Start with the total device current and the longest cable path. Then calculate the voltage available at the most distant device under full load. A high-power supply is useful when device count or cable distance creates a demanding power budget, but the complete segment design must still meet fieldbus voltage requirements.

Q2: Can this module support both FOUNDATION Fieldbus H1 and PROFIBUS PA?

The product information specifies both fieldbus technologies. However, engineers should confirm the host system, motherboard, segment coupler, and configuration support the intended protocol. A compatible power supply does not replace protocol-specific segment components.

Q3: What should be checked when the PWR LED is green but remote devices still lose communication?

The green PWR indication confirms output voltage above 28 V at the module. It does not prove that every remote device receives sufficient voltage. Measure voltage along the trunk, inspect spur connections, and review device current consumption and cable resistance.

Q4: Does hot swapping guarantee uninterrupted operation during every module replacement?

No. The hot-swap feature applies to a suitable redundant configuration. Confirm that the redundant partner is operational and that the motherboard and system architecture support online replacement. Follow the approved maintenance procedure before removing the module.

Q5: What information should buyers provide when sourcing a replacement?

Provide the complete model number HD2-FBPS-1.500, installed motherboard type, fieldbus protocol, redundancy arrangement, and hazardous-area requirements. If replacing an existing unit, compare the nameplate and certification details. These checks help prevent a mechanically compatible but electrically unsuitable selection.

Tags

Q: Are these parts 100% original and new?

A: Yes. Every component is guaranteed to be 100% original, brand-new, and factory-sealed. We also provide a 12-month comprehensive warranty for your peace of mind.

Q: How fast is the shipping to my country?

A: For in-stock items, we offer same-day dispatch. International express shipping (DHL/FedEx/UPS) typically delivers within 3–5 business days worldwide.

Q: Can I get a formal quotation with shipping costs?

A: Absolutely. Our sales team is ready to provide a detailed Proforma Invoice (PI) including the most competitive shipping rates for your location.

Q: Do you offer discounts for bulk orders?

A: We provide volume-based pricing for large projects or multiple-item orders. Please contact us to get our Best Price Guarantee.




12-Month Comprehensive Warranty

Every part supplied by Global PLC Spare Hub is covered by a 12-month warranty from the date of invoice.

  • Coverage: Functional defects and hardware failures under normal operating conditions.
  • Commitment: We provide immediate repair, replacement, or a full refund for any verified defective components to minimize your operational downtime.

Returns & Exchange Policy

We offer a 30-day return policy to ensure you receive the exact part your system requires.

  • Eligibility: Returns are accepted for uninstalled items in their original, factory-sealed packaging.
  • RMA Process: Please contact our support team to obtain a Return Merchandise Authorization (RMA) number before shipping.
  • Fast Processing: Refunds or exchanges are processed within 3–5 business days after the returned item passes our technical inspection.

Need Technical Assistance?Not sure if this part is compatible with your system? [Consult our Engineers] before purchasing to ensure 100% compatibility.