SNB10D-225/CU2N Yokogawa Safety Node Unit | Dual Power ESB Bus
Manufacturer: Yokogawa
Product No.: SNB10D-225/CU2N
Condition: In stock
Product Type: Safety Node Unit
Product Origin: SG
Payment: T/T, Western Union
Weight: 5900g
Shipping port: Xiamen
Warranty: 12 months
Estimate delivery times: 12-26 days (International), 3-6 days (United States).
Return within 30 days of purchase. Duties & taxes are non-refundable.
Guaranteed Safe Checkout
Yokogawa SNB10D-225/CU2N Safety Node Unit
01 | System Overview: Safety Control and Node Expansion
The Yokogawa SNB10D-225/CU2N is a rack-mountable safety node unit for Yokogawa safety control systems. It supports distributed safety system expansion through the ESB bus. This configuration combines dual-redundant power supplies, an R3 node expansion software license, and an ESB bus connector unit. It uses a 220–240 V AC supply and supports ISA Standard G3 environmental conditions. The unit connects to compatible safety control units through an approved ESB bus coupler. Engineers can expand safety I/O capacity while maintaining a structured rack installation.
02 | Configuration Breakdown: Decode the Ordering Code
| Code segment | Configuration | Engineering significance |
|---|---|---|
| SNB10D | Safety Node Unit | Identifies the equipment family and node function. |
| -2 | Dual-redundant power supply with R3 node expansion software license | Provides redundant power architecture and the specified expansion license. |
| 2 | 220–240 V AC power supply | Defines the required AC supply class. |
| 5 | ISA Standard G3; −20 to 70°C; no explosion protection | Defines the specified environmental option. |
| CU2N | ESB Bus Connector Unit | Identifies connector unit S9342FA. |
**Complete configuration:** SNB10D-225/CU2N - Rack-mountable safety node unit. - Dual-redundant power supply. - R3 node expansion software license. - 220–240 V AC, 50/60 Hz. - ISA Standard G3 environmental option. - Operating temperature specification: −20 to 70°C. - ESB bus connector unit S9342FA. - No explosion protection.
03 | Technical Specifications
| Parameter | Specification |
|---|---|
| Manufacturer | Yokogawa |
| Model | SNB10D-225/CU2N |
| Product type | Safety Node Unit |
| Mounting | Rack mounting |
| Power supply configuration | Dual-redundant |
| Rated supply voltage | 220–240 V AC |
| Supply frequency | 50/60 Hz |
| Power consumption | 230 VA for the 220–240 V AC specification |
| Expansion software | R3 node expansion license |
| Bus interface | ESB bus connector unit S9342FA |
| Environmental option | ISA Standard G3 |
| Specified temperature range | −20 to 70°C |
| Explosion protection | Not included |
| Dimensions (L × W × H) | 205 × 482 × 221 mm |
| Approximate weight | 5.9 kg |
| Rack fastening | Four M5 screws with insulation bushes |
04 | ESB Expansion Capacity and System Architecture
The SNB10D connects safety node units to compatible safety control units through an ESB bus coupler. The supported node count depends on the coupler and controller configuration.
| ESB bus coupler | Supported safety control units | Maximum connected safety node units |
|---|---|---|
| SEC402 | S2SC70S, S2SC70D, SSC60S, SSC60D | Up to 13 |
| SEC401 | Safety control unit using SEC401 | Up to 9 |
These figures describe the supplied system limits. Confirm the applicable controller, bus coupler, software, and system configuration before adding nodes. The R3 expansion license supports the specified node expansion function. It does not automatically authorize every controller combination or maximum node arrangement.
05 | Power Architecture and Rack Installation
The selected configuration uses a 220–240 V AC supply. Its specified power consumption is 230 VA. The dual-redundant supply configuration supports power redundancy. Verify the actual power distribution arrangement and redundancy requirements in the system design. **Rack installation sequence**
- Confirm the rack supports the unit's dimensions and mounting arrangement.
- Check available rack space and access for the ESB bus connection.
- Verify the supply voltage and frequency against the nameplate.
- Install the unit using four M5 mounting screws.
- Use the specified insulation bushes during mounting.
- Connect the approved ESB bus interface and power wiring.
- Inspect the installation before applying power.
- Follow Yokogawa commissioning procedures to verify node communication.
The supplied information does not specify connector torque, rack clearance, or detailed wiring limits. Refer to the applicable installation manual.
06 | Suitable Equipment and Industrial Applications
The SNB10D-225/CU2N is intended for compatible Yokogawa safety control installations. Its primary role involves safety system node integration and expansion.
- Safety instrumented systems: Connect supported safety nodes to compatible safety controllers.
- Process plant protection: Support safety control architectures in chemical and petrochemical facilities.
- Power generation: Integrate compatible safety nodes into engineered plant protection systems.
- Oil and gas facilities: Support distributed safety system configurations in approved control cabinets.
- Industrial expansion projects: Add supported nodes when the controller and ESB architecture permit expansion.
- Control system modernization: Replace a matching node unit after verifying hardware, licensing, and interface compatibility.
The unit is not a standalone safety controller. Its suitability depends on the complete safety system architecture and certified application design.
07 | Diagnostics and Field Verification
The supplied specifications do not identify specific onboard diagnostic LEDs, fault codes, or individual diagnostic functions. Engineers should use the applicable Yokogawa safety system diagnostic tools. During commissioning or troubleshooting, inspect the following:
- Node communication: Confirm that the safety control unit recognizes the connected node.
- ESB bus connection: Inspect connector seating, cable identification, and bus coupler compatibility.
- Power status: Verify the AC supply and investigate power-related alarms through approved system diagnostics.
- Redundancy status: Confirm that the configured redundant power arrangement operates as designed.
- Expansion configuration: Check the node count, license status, and controller configuration.
- Temperature conditions: Confirm that the installed environment remains within the specified range.
**Field example:** A newly installed safety node fails to appear in the controller configuration. First, verify the ESB connector and coupler model. Then check the expansion license and approved node count. Avoid replacing the node before checking these system-level dependencies.
08 | Compatibility, Environmental Limits, and Safety
Before ordering, verify the complete system configuration.
- Confirm the safety control unit model.
- Confirm SEC401 or SEC402 bus coupler compatibility.
- Check the supported number of connected nodes.
- Verify the R3 expansion license requirement.
- Confirm ESB connector unit S9342FA and associated wiring.
- Check the 220–240 V AC supply and 50/60 Hz frequency.
- Verify rack dimensions and mounting provisions.
- Confirm the site temperature and environmental classification.
The specified environmental option supports ISA Standard G3 and −20 to 70°C. The configuration does not include explosion protection. The supplied specifications do not identify a specific SIL certificate or safety integrity rating for this unit. Confirm applicable certification and system safety requirements through official documentation.
09 | Global PLC Spare HUB's Insight
When selecting a safety node unit, engineers should evaluate its role within the complete ESB architecture. The controller, coupler, expansion license, and node count determine practical compatibility. For example, a plant may plan to expand an existing safety system with additional nodes. The engineering team should identify its safety controller and ESB coupler first. A SEC402 configuration supports up to 13 safety node units for the listed controller models. A SEC401 configuration supports up to 9. The team should also verify rack space and supply arrangements. Dual-redundant power does not remove the need for correct power distribution and system commissioning.
10 | Packaging, Warranty, and Shipping
- Product: Yokogawa SNB10D-225/CU2N Safety Node Unit.
- Packaging: Protective packaging for industrial control equipment.
- Accessories: Confirm included mounting hardware and connector accessories with the supplier.
- Warranty: 12-month warranty, subject to applicable sales terms.
- Shipping options: FedEx, UPS, and DHL.
- Dispatch target: 24–48 hours after order confirmation and stock verification.
11 | Frequently Asked Questions
- Does the SNB10D-225/CU2N include the ESB bus connector unit? The CU2N option identifies connector unit S9342FA. Confirm the supplied package contents and any separate cabling requirements before ordering.
- 2. Can this model operate from a 24 V DC supply? This specific configuration specifies 220–240 V AC. Other SNB10D supply options may exist, but they require different suffix codes. Do not apply 24 V DC to this AC-rated configuration.
- 3. How do I determine whether my safety system can support another node? Identify the controller and bus coupler first. Then check the supported node limit, installed expansion license, and system configuration. The stated maximum alone does not confirm available capacity.
- 4. What should I investigate if a node loses communication after installation? Check the ESB bus connection, coupler compatibility, power status, node configuration, and expansion license. Use the system's diagnostic tools to identify the fault before replacing hardware.
- 5. What information helps confirm the correct replacement unit? Provide the existing unit's full model code, controller model, ESB coupler, supply voltage, and rack configuration. These details help verify the hardware and expansion options before purchase.

Tags
Q: Are these parts 100% original and new?
A: Yes. Every component is guaranteed to be 100% original, brand-new, and factory-sealed. We also provide a 12-month comprehensive warranty for your peace of mind.
Q: How fast is the shipping to my country?
A: For in-stock items, we offer same-day dispatch. International express shipping (DHL/FedEx/UPS) typically delivers within 3–5 business days worldwide.
Q: Can I get a formal quotation with shipping costs?
A: Absolutely. Our sales team is ready to provide a detailed Proforma Invoice (PI) including the most competitive shipping rates for your location.
Q: Do you offer discounts for bulk orders?
A: We provide volume-based pricing for large projects or multiple-item orders. Please contact us to get our Best Price Guarantee.
12-Month Comprehensive Warranty
Every part supplied by Global PLC Spare Hub is covered by a 12-month warranty from the date of invoice.
- Coverage: Functional defects and hardware failures under normal operating conditions.
- Commitment: We provide immediate repair, replacement, or a full refund for any verified defective components to minimize your operational downtime.
Returns & Exchange Policy
We offer a 30-day return policy to ensure you receive the exact part your system requires.
- Eligibility: Returns are accepted for uninstalled items in their original, factory-sealed packaging.
- RMA Process: Please contact our support team to obtain a Return Merchandise Authorization (RMA) number before shipping.
- Fast Processing: Refunds or exchanges are processed within 3–5 business days after the returned item passes our technical inspection.
Need Technical Assistance?Not sure if this part is compatible with your system? [Consult our Engineers] before purchasing to ensure 100% compatibility.



