Home SEC-Z532MGX HORIBA STEC SEC-Z500X 100 SLM Digital Mass Flow Controller

SEC-Z532MGX HORIBA STEC SEC-Z500X 100 SLM Digital Mass Flow Controller

  • Manufacturer: HORIBA

  • Product No.: SEC-Z532MGX

  • Condition: In stock

  • Product Type: Mass Flow Controller

  • Product Origin: USA

  • Payment: T/T, Western Union

  • Weight: 500g

  • Shipping port: Xiamen

  • Warranty: 12 months

Selected quantity: 1
Request a quote

Estimate delivery times: 12-26 days (International), 3-6 days (United States).

Return within 30 days of purchase. Duties & taxes are non-refundable.

Guaranteed Safe Checkout

Visa
PayPal
Mastercard
American Express

SEC-Z532MGX | 100 SLM High-Flow Digital Mass Flow Controller

HORIBA STEC SEC-Z532MGX is a high-flow mass flow controller from the SEC-Z500X Digital/Analog Series. It regulates gas delivery in semiconductor manufacturing and industrial gas systems.

This model provides a full-scale flow capacity of 100 SLM based on N₂ equivalent calibration. Its multi-gas and multi-range configuration supports gases such as nitrogen, argon, hydrogen, and helium.

The controller combines a precision flow measurement system with a piezoelectric control valve. It supports analog setpoint control and digital communication through the RS-485 F-Net protocol. Its 1/2-inch VCR male connections support integration into high-purity gas delivery systems.

01 | Process Flow Architecture

The SEC-Z532MGX manages gas delivery through three functional stages.

Functional Stage Engineering Description
Gas Input Receives process gas through the 1/2-inch VCR connection.
Flow Measurement Measures gas flow against the configured gas and range parameters.
Control Processing Compares measured flow with the commanded setpoint.
Valve Regulation Uses a piezoelectric actuator to regulate gas flow.
Signal Feedback Provides analog output and RS-485 digital communication.

This architecture supports repeatable gas delivery and integration with automated process equipment.

02 | Flow Capacity and Measurement Performance

Flow capacity and measurement accuracy determine the controller's suitability for high-flow process applications.

Performance Parameter Specification
Full-Scale Flow 100 SLM
Reference Gas N₂ equivalent
Gas / Range Code MR/MG #09
Control Range 2–100% FS
Turndown Ratio 50:1
Accuracy Above 35% FS ±1.0% S.P.
Accuracy at or Below 35% FS ±0.35% FS
Repeatability ±0.2% FS
Linearity ±0.5% FS
Response Time ≤1 second, T98
Response Test Condition Full flow range

Measurement interpretation:

  • S.P. means setpoint-based accuracy.
  • FS means full scale.
  • The accuracy specification changes at the 35% full-scale threshold.
  • T98 represents the time required to reach 98% of the final response.
  • The 2–100% FS control range provides a nominal 50:1 operating range.

Engineers should evaluate the accuracy specification at the intended operating flow. Do not apply the high-flow accuracy figure to every point in the measurement range.

03 | Gas Compatibility and Calibration Configuration

The SEC-Z532MGX supports multi-gas operation and different flow-range configurations.

Gas Category Examples Engineering Consideration
Inert Gases N₂, Ar Verify the selected gas calibration.
Light Gases H₂, He Confirm gas-specific conversion parameters.
Other Process Gases Subject to supported configuration Check manufacturer gas compatibility.

Important selection note: The 100 SLM rating uses N₂-equivalent calibration. It does not mean every supported gas delivers exactly 100 SLM under identical operating conditions.

Confirm the gas code, calibration conditions, and applicable conversion factors before changing the process gas. Do not assume that one calibration supports unrestricted gas switching.

04 | Pressure Envelope and Process Conditions

Pressure conditions directly influence gas delivery stability and system integration.

Operating Differential Pressure 100–300 kPa(d)
Maximum Operating Pressure 450 kPa(g)
Pressure Resistance 1000 kPa(g)
Recommended Temperature 15–45°C
Operating Temperature 5–50°C
Heated Configuration No, standard unheated version

Pressure terminology: Differential pressure describes the pressure difference across the controller. Gauge pressure references atmospheric pressure. Pressure resistance is a separate equipment rating, not a normal operating target.

05 | Wetted Materials and Mechanical Interface

The gas-contacting construction supports high-purity process gas applications.

  • Wetted Material: SUS316L stainless steel.
  • Internal Surface: Polished inner surface as standard.
  • Seal Options: Metal or elastomer, depending on configuration.
  • Connection Type: 1/2-inch VCR male fitting.
  • Fitting Distance: 132 mm.
  • Overall Dimensions: 139 × 70 × 38 mm (H × W × T).
  • Leak Integrity: ≤5 × 10⁻¹² Pa·m³/s (He).

Confirm seal material and gas compatibility before installation. The selected sealing configuration must match the process gas and system cleanliness requirements.

06 | Electrical Interface and Control Signals

The controller supports analog and digital command interfaces.

Interface Parameter Specification
Analog Setpoint 0.1–5 VDC
Analog Output 0–5 VDC
Digital Communication RS-485 F-Net
Communication Speed 38,400 bps
Connector Interface D-Sub 9-pin and RJ-45
Positive Supply +15 VDC ±5%, 150 mA
Negative Supply -15 VDC ±5%, 150 mA

Integration guidance:

  • Use the analog setpoint for compatible voltage-based control systems.
  • Read the analog feedback through a compatible 0–5 VDC input.
  • Configure RS-485 communication for supported F-Net master devices.
  • Verify connector pin assignments before wiring.
  • Provide stable bipolar power supplies within the specified tolerance.

07 | Valve Technology and Dynamic Control

The SEC-Z532MGX uses a piezoelectric actuator for flow regulation.

  • Actuator Type: Piezoelectric.
  • Valve Configuration: Normally open or normally closed, depending on configuration.
  • Control Function: Regulates gas flow according to the commanded setpoint.
  • Response Performance: T98 ≤1 second over the full flow range.

Valve configuration affects process behavior during power loss and equipment shutdown. Verify the installed normally open or normally closed option before defining safety interlocks.

08 | Installation and Commissioning Procedure

High-purity gas systems require controlled installation and contamination management.

  1. Confirm Gas Type: Match the process gas with the specified calibration configuration.
  2. Check Flow Range: Verify the 100 SLM N₂-equivalent rating meets process requirements.
  3. Inspect Connections: Check the 1/2-inch VCR male fitting and mating components.
  4. Verify Seals: Confirm metal or elastomer sealing compatibility.
  5. Check Pressure: Keep operating conditions within the specified pressure envelope.
  6. Connect Power: Apply the specified positive and negative DC supplies.
  7. Wire Control Signals: Select the appropriate analog or RS-485 interface.
  8. Configure Communication: Set the F-Net communication parameters where applicable.
  9. Verify Zero and Flow: Check the output under the manufacturer's specified test conditions.
  10. Perform Functional Testing: Compare commanded and measured flow across the intended operating range.

Use clean, compatible components during installation. Follow the equipment manufacturer's procedures for gas purging, leak testing, and process startup.

09 | Maintenance and Performance Verification

  • Inspect VCR connections for contamination and mechanical damage.
  • Check for gas leakage using an approved helium leak-testing method.
  • Verify power supply stability and signal wiring.
  • Compare analog feedback with the commanded setpoint.
  • Check RS-485 communication and network settings.
  • Review gas calibration parameters after process gas changes.
  • Investigate abnormal response times or unstable flow readings.
  • Confirm valve configuration during equipment replacement.

For semiconductor applications, maintenance procedures should preserve gas-path cleanliness. Avoid introducing particles or incompatible sealing materials into the process line.

10 | Semiconductor Process Applications

Application Process Function
CVD Systems Controls process gas delivery to deposition equipment.
Etch Equipment Regulates gas supply for plasma process operations.
Chamber Purge Controls inert gas delivery during chamber preparation.
Bulk Gas Panels Provides high-flow gas control within distribution systems.
Gas Delivery Units Supports automated flow regulation and monitoring.

11 | Compliance and Quality Requirements

  • RoHS: Compliant with the stated RoHS requirements.
  • SEMI: Designed with reference to applicable semiconductor equipment standards.
  • Gas Compatibility: Confirm the approved gas and wetted-material configuration.
  • Leak Integrity: Verify the specified helium leak-rate requirement.

Confirm the applicable SEMI standard numbers and product-specific compliance documents when project certification requires them.

12 | Frequently Asked Questions

Q1: Why does the indicated flow differ after changing from nitrogen to argon?

Different gases have different physical properties and calibration factors. The controller must use the correct gas-specific configuration. Check the gas code and reference conditions before adjusting the process setpoint.

Q2: What should engineers investigate if the controller responds slowly during a high-flow transition?

Check the actual differential pressure, upstream supply stability, downstream restrictions, and configured gas parameters. Also inspect the command signal and communication update rate. Do not attribute every slow response to the piezoelectric valve.

Q3: How should the normally open and normally closed valve options influence equipment selection?

Evaluate the required gas-flow behavior during loss of power or control. The preferred valve state depends on the process hazard analysis and shutdown strategy. Confirm the actual actuator configuration before connecting the controller.

Q4: What causes unstable flow readings when the process pressure appears normal?

Investigate pressure fluctuations at both sides of the controller, gas supply purity, installation restrictions, and electrical noise. Check whether the selected gas calibration matches the actual process gas. Stable pressure differential is important for repeatable flow control.

Q5: What information should semiconductor engineers provide when ordering a replacement?

Provide the complete model number, gas species, full-scale flow, gas code, seal material, VCR connection, and communication requirements. Also confirm the power supply and valve fail-state configuration. These details help prevent calibration and installation mismatches.

Tags

Q: Are these parts 100% original and new?

A: Yes. Every component is guaranteed to be 100% original, brand-new, and factory-sealed. We also provide a 12-month comprehensive warranty for your peace of mind.

Q: How fast is the shipping to my country?

A: For in-stock items, we offer same-day dispatch. International express shipping (DHL/FedEx/UPS) typically delivers within 3–5 business days worldwide.

Q: Can I get a formal quotation with shipping costs?

A: Absolutely. Our sales team is ready to provide a detailed Proforma Invoice (PI) including the most competitive shipping rates for your location.

Q: Do you offer discounts for bulk orders?

A: We provide volume-based pricing for large projects or multiple-item orders. Please contact us to get our Best Price Guarantee.




12-Month Comprehensive Warranty

Every part supplied by Global PLC Spare Hub is covered by a 12-month warranty from the date of invoice.

  • Coverage: Functional defects and hardware failures under normal operating conditions.
  • Commitment: We provide immediate repair, replacement, or a full refund for any verified defective components to minimize your operational downtime.

Returns & Exchange Policy

We offer a 30-day return policy to ensure you receive the exact part your system requires.

  • Eligibility: Returns are accepted for uninstalled items in their original, factory-sealed packaging.
  • RMA Process: Please contact our support team to obtain a Return Merchandise Authorization (RMA) number before shipping.
  • Fast Processing: Refunds or exchanges are processed within 3–5 business days after the returned item passes our technical inspection.

Need Technical Assistance?Not sure if this part is compatible with your system? [Consult our Engineers] before purchasing to ensure 100% compatibility.